Item/ Material per metric tonne
Current Tip Fee
| Regular Waste Disposal | |
|---|---|
| Regular waste disposal fee Robin Hood Bay | $94.50 |
| Recyclables disposal fee at Robin Hood Bay | $32.50 |
| Asbestos (Contact to make arrangement prior to delivery) | |
|---|---|
| Asbestos | $154.50 |
| Asbestos - Mixed Load | $296.50 |
| Off the Road Tires (tires that are not included in the tire recycling program of the Province-per metric tonne) | |
|---|---|
| OTR – Off the Road Tires | $220.50 |
| Rock | |
|---|---|
| 6 inches minus | Free |
| 18 inches minus | $37.50 |
| 18 inches plus | $94.50 |
| Concrete & Brick | |
|---|---|
| 6 inches minus (reinforced or unreinforced) | Free |
| 6 inches plus (reinforced) | $94.50 |
| 18 inches minus (unreinforced) | $37.50 |
| 18 inches plus (unreinforced) | $94.50 |
| Asphalt | |
|---|---|
| 6 inches minus | Free |
| 18 inches minus | $37.50 |
| 18 inches plus | $94.50 |
| Yard Waste | |
|---|---|
| Contained in paper yard waste bags or loose | Free |
| Contained in plastic waste bags | $94.50 |
| Brush/Tree Waste | |
|---|---|
| Branch/Trunk size must be less than 12-inch diameter and manageable by hand | Free |
| Special Wastes (Contact to make arrangement prior to delivery) | |
|---|---|
| Wastes requiring special handling (requires pre-approval and arrangements must be made prior to delivery to site) | $154.50 |
| International wastes | $154.50 |
| Unacceptable Waste (per metric tonne) | |
|---|---|
| Mixed Loads containing divertable materials | $174.50 |
| Rejected Wastes | $174.50 plus handling charges |
| Recycling Incorrectly Packaged or Delivered | $174.50 |